Phase B

Print
Press Enter to show all options, press Tab go to next option
PHASE B IS COMPLETE-please see below for summary information of this project:



PHASE B WATER, SEWER, AND STORMWATER(click here for map of Phase B)


The Phase B project was the second of 5 phases of capital improvement infrastructure projects that have been designed to enhance: 
1. pedestrian and vehicular transportation
2. water flow and quality
3. sewer service
4. storm water
5. other utilities (i.e. cable, electric, etc.)

Public Meeting-July 7, 2016
The Town held a project workshop to review the utility and street improvement that are planned.  Documents presented at the workshop included:
Project Schedule
Presentation Overview of the Project

Construction plans are listed below:
Sewer
Water
Storm Drain
Sidewalks