Phase D-1

Print
Press Enter to show all options, press Tab go to next option

Phase D-1  of the infrastructure/utility improvements project consisted of replacing the existing sanitary sewer gravity lines and stormwater drainage pipes. Existing water and sanitary sewer lines were replaced in the existing footprint. The existing storm drainage pipes were replaced in the same footprint, except in the areas where the existing  lines cross private property. These lines were relocated to the town owned and maintained right of ways. 

This project is Complete.

 

Planning_Interior_Resized