Phase E

Print
Press Enter to show all options, press Tab go to next option

Phase E of the infrastructure/utility improvements project will consist of replacing the existing water lines, sanitary sewer gravity pipes and the stormwater drainage pipes. Existing water and sanitary sewer line will be replaced in the existing footprint. The existing storm drainage pipes will also be replaced in the dame footprint, except in the areas where the existing lines cross private property. These lines will be relocated to the town owned and maintained right of ways. Street improvements will also be included in the Phase E project. The existing streets have varying pavement widths, ranging from 18 to 20 feet. The standard minimum street width will be 20 feet.

Phase E is currently in the planning and design stage and work is not expected to begin this year.

 

 