projects

Equalization Basin Improvements

The purpose of the Equalization Basin Improvements project is to line an existing unlined equalization basin, located at the Town of Carolina Beach WWTP, with a 60 mil geomembrane liner. The addition of this lined basin will provide additional equalization volumes during heavy rainfall and storm surge events.

This project is currently under construction, with a contract completion date of March 14, 2017.


wastewater-23
bids-gif   schedule-gif plans-gif   faq-gif